Uploaded image for project: 'Coin'
  1. Coin
  2. COIN-667

Put "Run them all" button alongside "List Configurations"

XMLWordPrintable

    • Icon: Suggestion Suggestion
    • Resolution: Done
    • Icon: P3: Somewhat important P3: Somewhat important
    • 1.5
    • master
    • Other
    • None
    • All
    • 27fdb215ae278fae5755a3a5195c4ef803c659a5

      On the Schedule Build tab / Status Check page, when I'm launching a test on all platforms, I have to wait for List Configurations to do its thing,. While that is useful when I want to test just a specific sub-set of configurations, it's just a tedious (and often long) wait when I'm just going to click the "All" button anyway.
      Would it be possible to provide the "All" button alongside List Configurations, so that I can just click All and leave the system to do what it needs to do in the background, without me needing to wait for it ?

      On a side note, aligning the name of the tab, "Schedule Build", with the name of the page, "Status Check" would perhaps be sensible.

        No reviews matched the request. Check your Options in the drop-down menu of this sections header.

            owolff Oliver Wolff
            Eddy Edward Welbourne
            Votes:
            0 Vote for this issue
            Watchers:
            1 Start watching this issue

              Created:
              Updated:
              Resolved:

                There are no open Gerrit changes