Uploaded image for project: 'Qbs ("Cubes")'
  1. Qbs ("Cubes")
  2. QBS-405

Add a way to control the order in which products are built / prebuild dependencies

    XMLWordPrintable

    Details

    • Type: Task
    • Status: Closed
    • Priority: P2: Important
    • Resolution: Duplicate
    • Affects Version/s: None
    • Fix Version/s: None
    • Component/s: General
    • Labels:
      None
    • Technical Risk:
      Normal

      Description

      Currently the build order in QBS is defined by Rules alone. There should be a way to specify that a dependency of product P must be fully processed before processing of P can begin (prebuild dependencies).

      My suggestion is for a bool property on the Depends item to control whether that dependency must be built in sequence or parallel (default). Can't think of a good name at the moment.

        Attachments

          Issue Links

          No reviews matched the request. Check your Options in the drop-down menu of this sections header.

            Activity

              People

              Assignee:
              jbornema Joerg Bornemann
              Reporter:
              jakepetroules Jake Petroules (DO NOT ASSIGN ISSUES)
              Votes:
              0 Vote for this issue
              Watchers:
              3 Start watching this issue

                Dates

                Created:
                Updated:
                Resolved:

                  Gerrit Reviews

                  There are no open Gerrit changes