Uploaded image for project: 'Qt 3D Studio'
  1. Qt 3D Studio
  2. QT3DS-1425 New timeline: Fixes for 2.0
  3. QT3DS-1601

Timeline operations get unacceptably slow when presentation size grows

    XMLWordPrintable

Details

    • d8951711c3f5a2f52c24715f15f9a446ca7ae755

    Description

      Adding children and changing slides is still annoyingly slow when presentation is large. For example, when running in debug mode, adding a new object to slide with 25 objects in it already takes 2-3 seconds, and changing to master slide and back takes about 10 seconds.

      The performance needs to be checked with release build, but since the time to do operations seems to increase exponentially when the number of items on a slide grows, I suspect even release builds suffer from significant slowdown when presentation size increases.

      Attachments

        No reviews matched the request. Check your Options in the drop-down menu of this sections header.

        Activity

          People

            e0348803 Miikka Heikkinen
            e0348803 Miikka Heikkinen
            Votes:
            0 Vote for this issue
            Watchers:
            1 Start watching this issue

            Dates

              Created:
              Updated:
              Resolved:

              Gerrit Reviews

                There are no open Gerrit changes