Uploaded image for project: 'Qt'
  1. Qt
  2. QTBUG-45483

October 26th, 2014 is absent from QML Calendar control with "Moscow - Russia" timezone

    XMLWordPrintable

Details

    • Bug
    • Resolution: Invalid
    • P2: Important
    • None
    • 5.3.2, 5.4.1
    • Quick: Controls 1
    • None
    • Linux, OS X

    Description

      2014-10-25 is immediately followed by 2014-10-27. Instead of the missing day calendar has March 27^th^, 2011 doubled. See the attached screenshots.

      I checked this with both Qt 5.3.2 and 5.4.1.

      With Qt 5.3.2, there is no visual selection for days from 2011-03-28 to 2014-10-25, inclusive. clicked and doubleClicked signals provide correct date parameter, but selectedDate is set to the day preceding one that was clicked.

      With Qt 5.4.1, visual selection works fine, but both signal parameters and selectedDate point to the day following the clicked one.

      CalendarClickTest.zip contains minimal test project.

      Attachments

        Issue Links

          No reviews matched the request. Check your Options in the drop-down menu of this sections header.

          Activity

            People

              Unassigned Unassigned
              tonygluk Anton Karandeev
              Votes:
              1 Vote for this issue
              Watchers:
              7 Start watching this issue

              Dates

                Created:
                Updated:
                Resolved:

                Gerrit Reviews

                  There are no open Gerrit changes