Coin Stability and Product Repository workshop

XMLWordPrintable

    • Icon: Epic Epic
    • Resolution: Done
    • Icon: P1: Critical P1: Critical
    • None
    • master, production
    • Coin (obsolete)
    • None
    • Coin Workshop 2017

      Summary

      During the Qt Bug Fixing week, we have decided to gather people and focus on improving items in the qtqa/tqtc-coin-ci repository that have been found difficult or complex to do. The length of the workshop was decided to be one week, which leaves enough time for pair-programming and discussions.

       

      Where:

      • Berlin office
      • Meeting room Zoo is booked for you whole week Mon – Fri. On Wednesday there is some gymnastics at 16:00 in meeting room, but you can join that ☺

       

      When: 11. – 15.12.2017 (Mon-Fri)

       

      Agenda planning

      Day       Time

      Mon       Afternoon: Prioritize Coin and Opennebula Issues

      Tue        Whole Day: Programming

      Wed       Whole Day: Product Repository

      Thu        Whole Day: Programming

      Fri          Whole Day: Programming

       

      Who/when

      Frederik: Mon (9:20 SFX, at the office around 10:00) – Thu (20:00 SFX)

      Simon is local = Will join discussions when needed.

      Jedrzej: Mon (lunch time) – Thu (evening)

      Aapo: Mon – Fri

      Matti: Mon – Fri

      Tony: Participates online to all planning or CI infrastructure related matters. Personal things prevents him travelling this time.

      Iikka: Flying in Tuesday evening...present whole Wednesday. Leaving in evening flight (19:00 from TXL)

      Ossi: Local and needed when production repo is planned = same time as Iikka

        No reviews matched the request. Check your Options in the drop-down menu of this sections header.

            aakeskimo Aapo Keskimölö
            aakeskimo Aapo Keskimölö
            Votes:
            0 Vote for this issue
            Watchers:
            10 Start watching this issue

              Created:
              Updated:
              Resolved:

                Estimated:
                Original Estimate - 1 week
                1w
                Remaining:
                Remaining Estimate - 1 week
                1w
                Logged:
                Time Spent - Not Specified
                Not Specified