Details

    • Task
    • Resolution: Out of scope
    • P1: Critical
    • 2012q4
    • None
    • Performance tracking
    • None

    Description

      In order to prevent and/or detect false positives, we need to do several things:

      1. Figure out the amount of false positives actually reported (we suspect there are quite a few, but we don't know for sure).
      2. Analyze the stability of the test environment, to figure out why different types of false positives are produced.
      3. Stabilize the test environment if possible.
      4. Provide some automatic way of detecting false positives (and thus be able to make statements like 'this regression is a false positive by a probability of 0.8').

      Attachments

        Issue Links

          No reviews matched the request. Check your Options in the drop-down menu of this sections header.

          Activity

            People

              bdo Jo Asplin (Inactive)
              bdo Jo Asplin (Inactive)
              Votes:
              0 Vote for this issue
              Watchers:
              2 Start watching this issue

              Dates

                Created:
                Updated:
                Resolved:

                Time Tracking

                  Estimated:
                  Original Estimate - 1 day
                  1d
                  Remaining:
                  Remaining Estimate - 1 day
                  1d
                  Logged:
                  Time Spent - Not Specified
                  Not Specified

                  Gerrit Reviews

                    There are no open Gerrit changes